Concrete Calculator
Calculate how much concrete you need for a slab, patio, footing, or column. Get results in cubic yards for ready-mix and 40, 60, or 80 lb bags.
Last updated 2026-08-21
What Is a Concrete Calculator?
A concrete calculator tells you exactly how much concrete you need for a slab, patio, footing, or column by turning your length, width, and thickness into cubic yards. It also converts that volume into ready-mix yards and 40, 60, or 80 lb bags so you can order the right amount the first time. Built for homeowners and DIYers, it removes the guesswork before you call a supplier or head to the home center.
How It Works
Volume (ft³) = Length × Width × (Thickness ÷ 12). Convert to cubic yards by dividing by 27.
Example
For a 10 ft × 10 ft pad at 4 in thick with 10% waste: 10 × 10 × (4 ÷ 12) = 33.3 ft³, × 1.1 = 36.7 ft³ ≈ 1.36 cubic yards (62 × 80 lb bags).
How to Calculate
- Measure the length and width of your pour in feet and the thickness in inches. For a 10 ft by 10 ft patio pad, that is 10 and 10 with a 4 in thickness.
- Enter a waste factor of 5 to 10% to cover spillage, uneven ground, and formwork. Use 10% for a typical pad.
- The calculator computes the volume: 10 × 10 × (4 ÷ 12) = 33.3 cubic feet, then × 1.1 for waste = 36.7 cubic feet.
- Read the result in cubic yards by dividing by 27, which gives about 1.36 cubic yards for this example.
- Use the bag conversion to see you need about 62 of the 80 lb bags, or order ready-mix for the 1.36 yard pour.
Bags of Concrete per Cubic Yard by Bag Size
| Bag Size | Yield per Bag | Bags per Cubic Yard |
|---|---|---|
| 40 lb | 0.30 cu ft | 90 bags |
| 60 lb | 0.45 cu ft | 60 bags |
| 80 lb | 0.60 cu ft | 45 bags |
| Ready-mix | 27 cu ft per yard | 1 yard minimum |
Sources
Frequently Asked Questions
What waste factor should I use?
A 5–10% waste factor is typical for slabs. Add more (10–15%) for footings or columns where forms and rebar cause extra waste.
How many bags are in a cubic yard?
Roughly 45 × 80 lb bags, 60 × 60 lb bags, or 90 × 40 lb bags fill one cubic yard.
Is concrete ordered by the cubic yard?
Yes. Ready-mix suppliers deliver by the cubic yard, so divide your volume in cubic feet by 27.
Estimate the cost with the Concrete Cost Calculator. Also try: Concrete Slab Calculator, Brick Calculator or browse Concrete Calculators