Backfill Calculator

Estimate backfill material needed for an excavation.

How It Works

Net volume = Excavation − Structure. Backfill = Net × (1 + Compaction ÷ 100).

Example

100 cu yd excavation with 40 cu yd of structure at 10% compaction: 60 × 1.1 = 66 cu yd.

Frequently Asked Questions

What is the structure volume?

The volume of the foundation, pipe, or wall that fills part of the hole and will not need backfill.

Why a compaction factor?

Backfill compacts to a smaller volume, so you order extra to end up at the desired grade.

What is a typical compaction factor?

10–20% is common, depending on the material and how much it is compacted.